On September 25, 2019, LLC “Wellons.RU” successfully completed a project to replace the refractory lining of the roof and the transitional section of the thermal oil installation (TMU-1). These works were performed on the terms of an EPCM contract, including engineering, selection and delivery of materials, as well as installation supervision of the work performed in accordance with the technical documentation of the project (installation work itself was performed by the customer)..