On July 20, 2020, according to contract No. 02/04/20 for technical inspection of the refractory lining of hot water boilers, specialists of Wellons.RU LLC carried out a visual inspection of the newly laid boiler lining No. 1-3 (after a major overhaul to replace refractory lining). The inspection results are shown in this report.