On February 25, 2020, specialists of LLC Wellons.RU performed internal inspection of the technical condition of the refractory lining of the boilers KVTm-3000 and KVT-4000 E. The results of the inspection of the lining are shown in this report.
On February 25, 2020, specialists of LLC Wellons.RU performed internal inspection of the technical condition of the refractory lining of the boiler KVT-4000 E. The results of the inspection of the lining are shown in this report.