We offer to supply super duty plastic material WELL PLAST R 85, which is designed in accordance with our requirements and with our direct participation, together with the domestic leading manufacturer of aluminate refractories. This material is an analogue of the leading American and European manufacturers. The recommended operating temperature - up to 1650 ° C, ready for use (does not require special dosage, mixing, special equipment – concrete mixers, etc.). The material is recommended for refractory works, both for the new refractory laying and restoration works of the existing refractory – local repairs. This material helps to repair with minimum outages refractory of curved surfaces, such as: circular walls, arch roofs, fuel chute; to bridge deep open cracks, chips, etc
Our company has a possibility of manufacturing the different parts of the handling equipment after the drawings provided by customers. Those parts can be used in really wide range of industries like listed below:
- Big dia screws of up to 500mm and more with 12m length;
- flight conveyers’ chains of ash handling systems and similar staff;
- fuel chains and similar to it;
- grain elevators chains;
- crosscutting lines and chains for logs handling (industries like plywood mills, MDF, DCB etc).
One of the main problems of deep wood processing industry (Pulp & Paper Mills, woodworking plants, plywood mills, etc.) is the waste wood disposal. Due to the fact that the rate of official waste disposal amounts to RUR 5,500 per ton, the plants are tempted to illegally dispose the various wastes and they continue to burn gas instead of making small reconstruction of thermal power unit and generating more revenue, or finding another source of profits from the bark and wood waste utilization.
In accordance with the concept of "KEY SOLUTION", WELLONS.RU offers a comprehensive solution on complex supply of all equipment (fuel feed systems to systems for steam discharge to common header or for electricity supply to mains, including building and structures) and services from design, construction and installation work to commissioning. DESIGN includes not only the direct engineering of the equipment itself, but also the development of entire PROJECT: "Preliminary design", "P" and "RD" stages.
PRELIMINARY PROJECT DOCUMENTATION includes two volumes: VOLUME 1 "The Basic Design Solutions", VOLUME 2 "EIA. Environmental Impact Assessment." This presentation briefly shows the contents of the volumes and their interpretation.
In accordance with the concept of "KEY SOLUTION", WELLONS.RU offers to evaluate your project on the reconstruction of old boiler house or construction of a new mini heating power plant in the shortest time possible. The development of a project concept, the analysis of input data, the calculation and assessment of financial performance takes no more than 3-5 days after receipt of input data from a customer. This calculation includes an assessment of the main project indicators: simple and discounted payback period (DPP), the net present value (NPV) internal rate of return (IRR), return on investment (ROI), profitability index (IP), the EBITDA profitability of the project.
In accordance with the concept of "key solution", WELLONS.RU offers a full set of civil and erection works (SMR), related to the implementation of your project, including: earthworks, foundation works, erection of buildings and structures steelwork, installation of mechanical and electrical equipment, internal and external engineering networks, alarm systems, automated systems, instrumentation and controls...
In accordance with the "key solution" concept, WELLONS.RU performs the works associated with the replacement or repair of the refractory lining in the post-warranty service period. We prepare a refractory lining laying scheme, and calculate the amount of refractory and auxiliary materials required (anchor devices, thermal insulation). We offer services for supervision over the correct performance of refractory lining installation works, according to the guidelines issued or, at the customer request, may perform on the EPC-contract terms the entire cycle of lining works – from the supply of materials to equipment commissioning after lining work completion.
Our experts will support the certification of product compliance to requirements of TR CU 032/2013 "On the Safety of High Pressure Equipment". We are working with documents in English and prepare ourselves the necessary documents basing on your factory documentation (including the one made in foreign language) to issue the certificate and / or a TR CU declaration.